Construction Completed

2023 Completed Projects

Project Number Location Type of Work Contractor Date Completed
SAP 050-599-176 Bridge 50K93 and 50K94 in Udolpho TWP Bridge Construction Fitzgerald Excavating 8.18.2023
SAP 050-599-180 Bridge 50K96 in Austin TWP Bridge Construction Fitzgerald Excavating 9.1.2023
SAP 050-599-182 Bridge 50K95 in Austin TWP Bridge Construction Fitzgerald Excavating 9.13.2023
CP 50-23-08 County Road 54 Cold In-place Recycling Rochester Sand & Gravel 8.16.2023
SAP 050-619-019 CSAH 19 from CSAH 6 to CSAH 4  Cold In-place Recycling Rochester Sand & Gravel 8.16.2023
SAP 050-619-020 CSAH 19 btwn TH 56 and CSAH 46 Cold In-place Recycling Rochester Sand & Gravel 8.16.2023
SAP 050-614-012 CSAH 14 from TH 56 to TH 16 Micro-surfacing  Asphalt Surface Technologies Corp.  8.15.2023
CP 50-23-11 14 Locations  Cured-In-Place-Pipe Lining Subsurface Inc. 9.5.2023
CP 50-23-10 9 Locations Guard Rail Replacement H & R Const. Co.  7.27.2023
CP 50-23-09 44 Locations  Rumble Strip Installation Shreffler Crack Sealing 9.7.2023